Some great things are taking place in Adams Park!
The Master Grill Area, Amphitheater or Canyon as some call it. will have erosion remediation work completed in this area and those horrendous green picnic tables...bye bye, along with a couple big trees. I expect the ground will look a lot different and the way the water flowed into this area will be corrected.
How about a Boardwalk all of the way around the lake...Shut the front to door, AP! With a new pump house with a porch to fish from. The work should be beginning soon and completed by Spring 2016.
